PEIR Figures < Home Preliminary Environmental Information Report Figures Figures 1.1 Site Location Plan 2.1 Draft Order Limits 2.2 Preliminary Design – Western Panel Area 2.3 Preliminary Design – Central Panel Area 2.4 Preliminary Design – Northern Panel Area 2.5 Preliminary Design – Eastern Panel Area 2.6 Preliminary Design – Southern Panel Area 2.7 Environmental Designations 2.8 Typical Solar PV Module Designs 2.9 Hybrid Packs 2.10 Typical Switchgear 2.11 Typical Substation 2.12 Typical Fencing 2.13 Typical CCTV pole 5.1 Location of Observations 5.2 Agricultural Land Classification 6.1 Waterbody Location Plan 6.2 Statutory Designated Wildlife Sites within 10km 6.3 Local Wildlife Sites within 2km 6.4 Ancient Woodland within 2km 6.5 Priority Habitats within 2km 6.6 UKHab Habitat Plan 6.7 Otter and Water Vole Survey 8.1 Heritage Assets within Order Limits 8.2 Heritage Assets within 2km of the Draft Order Limits 8.3 Geophyiscal survey results within Order Limits 9.1 Zone of Theoretical Visibility 9.2 Aviation Receptors 9.3 Road, Rail, Trail and PRoW 9.4 Observation Point Receptors 10.1 Site Location and Study Area 10.2 Topography and Hydrology 10.3 Geology 10.4 Landcover and Vegetation Patterns 10.5 Land use and Settlement 10.6 Movement and Connectivity 10.7 Tranquillity Baseline 10.8 Night Time Baseline 10.9 Other Relevant Designations 10.10 National Landscape Character Areas 10.11 District Landscape Character Areas 10.12 Local Landscape Character Areas 10.13 Zone of Theoretical Visibility (ZTV) – Bare Earth 10.14 Zone of Theoretical Visibility (ZTV) – with Screening 10.15 Representative Viewpoints 11.1 Existing Sensitive Receptor Plan 11.2 Operational Noise Contour Plots 11.3 Construction Noise Buffer 12.1 Site Location and Study Area 12.2 Public Rights of Way 13.1 HGV Routes to Construction Compounds 14.1 Surface Water Features 14.2 Bedrock Geology 14.3 Superficial Geology 14.4 WER/WFD Surface Water Bodies 14.5 WER/WFD Groundwater Bodies 14.9 Groundwater Designations 14.10 Licenced Abstractions and Discharges 14.11 Risk of Flooding from Surface Water 14.12 Risk of Flooding from Rivers and Seas 14.13 Risk of Flooding from Reservoirs 14.14 Susceptibility to Groundwater Flooding 14.15 Environment Agency Ecological Monitoring Locations 14.6 Wendling Beck WER Water Body – Watercourse Naming 14.7 Watton Brook WER Water Body – Watercourse Naming 14.8 Wissey – Upper WER Water Body – Watercourse Naming 15.1 Long list of Committed Developments 15.2 Short list of Committed Developments Contact Us To contact the project team, you can: Email us at info@highgrovesolar.co.ukRing us on 01362 350 063Or via post at FREEPOST HIGH GROVE SOLAR Follow us on Facebook or Instagram Register for Updates We encourage you to register below to receive updates about the project. You can register for updates using the form below: Name(Required) Dr.MissMr.Mrs.Ms.Mx.Prof.Rev. Title First Last Email(Required) Post Code(Required) Age Consent(Required) I confirm I am over the age of 13, and agree to the privacy statement.