Preliminary Environmental Information Report Figures

Figures

1.1

Site Location Plan

2.1

Draft Order Limits

2.2

Preliminary Design – Western Panel Area

2.3

Preliminary Design – Central Panel Area

2.4

Preliminary Design – Northern Panel Area

2.5

Preliminary Design – Eastern Panel Area

2.6

Preliminary Design – Southern Panel Area

2.7

Environmental Designations

2.8

Typical Solar PV Module Designs

2.9

Hybrid Packs

2.10

Typical Switchgear

2.11

Typical Substation

2.12

Typical Fencing

2.13

Typical CCTV pole

5.1

Location of Observations

5.2

Agricultural Land Classification

6.1

Waterbody Location Plan

6.2

Statutory Designated Wildlife Sites within 10km

6.3

Local Wildlife Sites within 2km

6.4

Ancient Woodland within 2km

6.5

Priority Habitats within 2km

6.6

UKHab Habitat Plan

6.7

Otter and Water Vole Survey

8.1

Heritage Assets within Order Limits

8.2

Heritage Assets within 2km of the Draft Order Limits

8.3

Geophyiscal survey results within Order Limits

9.1

Zone of Theoretical Visibility

9.2

Aviation Receptors

9.3

Road, Rail, Trail and PRoW

9.4

Observation Point Receptors

10.1

Site Location and Study Area

10.2

Topography and Hydrology

10.3

Geology

10.4

Landcover and Vegetation Patterns

10.5

Land use and Settlement

10.6

Movement and Connectivity

10.7

Tranquillity Baseline

10.8

Night Time Baseline

10.9

Other Relevant Designations

10.10

National Landscape Character Areas

10.11

District Landscape Character Areas

10.12

Local Landscape Character Areas

10.13

Zone of Theoretical Visibility (ZTV) – Bare Earth

10.14

Zone of Theoretical Visibility (ZTV) – with Screening

10.15

Representative Viewpoints

11.1

Existing Sensitive Receptor Plan

11.2

Operational Noise Contour Plots

11.3

Construction Noise Buffer

12.1

Site Location and Study Area

12.2

Public Rights of Way

13.1

HGV Routes to Construction Compounds

14.1

Surface Water Features

14.2

Bedrock Geology

14.3

Superficial Geology

14.4

WER/WFD Surface Water Bodies

14.5

WER/WFD Groundwater Bodies

14.9

Groundwater Designations

14.10

Licenced Abstractions and Discharges

14.11

Risk of Flooding from Surface Water

14.12

Risk of Flooding from Rivers and Seas

14.13

Risk of Flooding from Reservoirs

14.14

Susceptibility to Groundwater Flooding

14.15

Environment Agency Ecological Monitoring Locations

14.6

Wendling Beck WER Water Body – Watercourse Naming

14.7

Watton Brook WER Water Body – Watercourse Naming

14.8

Wissey – Upper WER Water Body – Watercourse Naming

15.1

Long list of Committed Developments

15.2

Short list of Committed Developments

Contact Us

To contact the project team, you can:

Email us at info@highgrovesolar.co.uk
Ring us on 01362 350 063
Or via post at FREEPOST HIGH GROVE SOLAR

Register for Updates

We encourage you to register below to receive updates about the project.

You can register for updates using the form below:
Name(Required)